Electricity to a shed

Power to a shed at a house means a new circuit from the fuse board. Since 1 October 2013 only a Registered Electrical Contractor may do that work, with no exemption for the owner, and the contractor gives you a Completion Certificate. The work is priced on a visit, because it turns on the distance from the fuse board and what the shed needs.

Who may run power to a shed, what the certificate is, and how to plan the supply before the shed goes up.

No charge and no obligation. Only one builder in your county ever sees your request.

  • 1 October 2013restricted electrical works began
  • REC onlymay add a circuit or change a fuse board at a house
  • Noexemption for the owner of the house
Gloved hands testing the connections in an electrical panel

What the law says

The energy regulator, the CRU, puts it plainly: use a Registered Electrical Contractor for electrical work in your home, because it is the law. When the work is done, the contractor gives you a Completion Certificate, which shows it is safe and up to standard.

Since 1 October 2013, three kinds of work at a house are restricted to registered contractors: a new electrical installation, any change to a fuse board, and adding or replacing a circuit. There is no exemption for the owner. Small jobs stay outside it, such as replacing a switch or adding a socket to a circuit that is already there.

What that means for a shed

Power to a shed starts at the house's fuse board, so it means a new circuit, which is restricted work. A small fuse board inside the shed counts as a fuse board too. Either way the job goes to a Registered Electrical Contractor, and the certificate comes with it.

Price your shed

Three taps and your county, and the price shows as you go. Your name and number come last, and only if you want a builder to price it.

A steel shed, about 3 × 3 m, behind the house: €1,110 to €2,990, built on site.

Step 1 of 5

What kind of shed?

Pick the closest. The builder asks the rest.

How the price is worked out

The figure is what a shed of that kind and size costs in Ireland now, delivered and put up on your site by the seller's own crew. Where prices differ, you see the lowest and the highest. A steel garage starts at 6 × 3 m, so smaller sizes show where it starts. Block-built sheds are priced after a visit. The base, electrics and any windows beyond the standard ones are not in any figure, because they depend on your site. Ask whether a quote includes VAT, and at which rate. Use it to plan with. It is not a quote: a builder prices yours after seeing where it goes.

Planning the supply

  • Decide what it powers. Lights, sockets, a heater, a roller door or a charger. Each changes the cable and the board.
  • Mark where they go. Before the shed is ordered, so the door and window end up near the work and the contractor can plan the run.
  • Think about the route. The shorter and simpler the run from the house, the less it costs.
  • Use daylight too. Clear roof panels or a window cut the need for lights by day.

At a business

The restricted-works rule covers homes. Commercial premises fall outside it, but the work still needs doing properly: ask for a certificate for any supply to a shed or building at a business. Sheds for a business.

Questions before you build

Can I wire my own shed?

Not at a house. Since 1 October 2013 adding a circuit or changing a fuse board is restricted to Registered Electrical Contractors, with no exemption for the owner.

Who can run power to a shed?

A Registered Electrical Contractor. They add the circuit from the house, fit any board in the shed and give you a Completion Certificate.

What is a Completion Certificate?

The certificate a Registered Electrical Contractor gives you when the work is done. It shows the work is safe and up to standard.

How much does electricity to a shed cost?

It is priced on a visit, because the distance from the fuse board, the route and what the shed powers all change it.

Can I add a socket myself?

Adding a socket to a circuit that is already there is minor work outside the restricted list. A new circuit to a shed is not.

Everything on this site

A green steel-clad shed with a side door beside a steel carport over a pickup truck, on grass

Your shed, priced before anyone calls

Pick the kind of shed, a size and where it goes. A firm quote comes from a single shed builder in your county, once you ask for one.